Methodist Encampment Water Well (Kerrville, TX)
Project Scope
Phase 1 included the drilling and casing of a municipal Aquifer Storage and Recovery (ASR) well, including all construction, pumping tests, casing pressure tests, various logging reports, and alignment survey.
Phase 2 of the project included the installation of a submersible pump, installation of discharge piping and appurtenances, connection to an existing 12-inch distribution main, electrical demolition and renovation at the well site, and SCADA instrumentation for the new construction.