Phase 2 I&I Rehabilitation and Replacement (Kerrville, TX)
Project Scope
The renewal and replacement of approximately 16,800 linear feet of deteriorated wastewater pipe and associated manholes to address ongoing inflow and infiltration problems with the city’s sanitary sewer system.
Sanitary sewer rehabilitation methodologies used in the projected consisted of cured in place pipe (CIPP), pipe bursting, and point repairs.